The GE Mark V control system is a trusted platform used globally to manage gas and steam turbines in power generation. Within this system, PLU termination boards play a critical role in managing and routing discrete signals between field devices and the control processors. Proper installation and ongoing maintenance of these boards are essential to ensure turbine safety, reliability, and optimal performance.
This article outlines the installation procedures, troubleshooting tips, and best practices for working with PLU termination boards in the GE Mark V system.
Understanding PLU Termination Boards
PLU (Power Limit Unit) termination boards are interface modules used in the Mark V system to connect discrete field signals—such as relay contacts, limit switches, and status indicators—to the turbine’s core control hardware.
These boards act as signal routers, receiving inputs from field devices and passing them to the control processors for logic execution. They typically reside within the <PD> core of the Mark V cabinet and are equipped with screw-type terminal blocks for field wiring connections.
The PLU termination board is also responsible for isolating and conditioning signals to prevent electrical noise or interference from disrupting turbine operation.
Installation Guidelines
1. Preparation and Safety
Before beginning installation, always:
-
Ensure complete power shutdown of the control panel.
-
Use anti-static precautions (such as ESD wrist straps).
-
Review the system documentation to confirm compatibility and connection requirements.
2. Mounting the Board
-
Identify the appropriate slot in the <PD> core for the termination board.
-
Align the board with its backplane connectors and gently but firmly press it into place.
-
If applicable, secure the board with mounting screws to prevent vibration-related movement.
3. Connecting Field Wiring
-
Use the terminal blocks on the board to connect field devices such as trip relays, pressure switches, or status inputs.
-
Follow the turbine wiring diagrams to ensure correct signal mapping.
-
Confirm proper cable shielding and grounding to minimize electrical interference.
4. Power-Up and Initial Testing
-
After installation, restore power to the system.
-
Observe LED indicators (if present) to confirm the board is receiving and processing signals.
-
Run system diagnostics or a functional test to validate all connected inputs and outputs.
Common Troubleshooting Scenarios
Even with proper installation, issues can arise over time due to environmental factors, wear, or misconfigurations. Here are some common problems and their solutions:
1. No Signal Detected from Field Device
Possible Causes:
-
Loose or miswired terminal connections
-
Failed field device or signal not reaching the board
-
Backplane communication issues
Solutions:
-
Verify wiring against schematics
-
Test continuity from the field device to the board
-
Reseat the board or test with a known working unit
2. Intermittent Input or Nuisance Alarms
Possible Causes:
-
Vibration causing loose terminal screws
-
Aging components or corrosion on contacts
-
Electrical noise from nearby devices
Solutions:
-
Tighten all connections and inspect for signs of oxidation
-
Replace deteriorated connectors or relays
-
Ensure proper grounding and shielding of all cabling
3. Diagnostic LEDs Not Functioning
Possible Causes:
-
No power to the board
-
Internal board failure
-
Inactive or disconnected input signals
Solutions:
-
Check backplane voltage supply
-
Test inputs independently
-
If LEDs remain inactive, consider board replacement
Preventive Maintenance Tips
To ensure long-term reliability of PLU termination boards:
-
Perform regular inspections for loose wiring and physical damage
-
Maintain a clean, climate-controlled environment inside the control cabinet
-
Replace aging relays or connectors during scheduled outages
-
Keep up-to-date documentation for fast troubleshooting during emergencies
Final Thoughts
PLU termination boards are vital components in GE Mark V turbine control systems. They serve as the interface between field inputs and control logic, handling safety-critical signals that influence turbine operation. A well-executed installation and a clear troubleshooting approach can drastically reduce downtime and prevent costly outages.
By following best practices and staying proactive with maintenance, power plant teams can ensure that these boards continue to perform reliably in demanding operational environments.